Community Corner
RIDOT Lists Traffic, Construction Schedule
The state Department of Transportation posts its weekly list of projects and traffic pattern changes scheduled through Friday, June 24.
For up-to-date information on road closures and contruction schedules for projects managed by the Rhode Island Department of Transportation, visit: www.dot.ri.gov/travelri/detourmaps.asp
Interstate-295:
SB at Exit 8A (Rte. 7), alternating shoulder closures on exit ramp for bridge inspections, Monday and Tuesday from 8:30 a.m. to 4:30 p.m
Find out what's happening in Johnstonwith free, real-time updates from Patch.
I-295 SB at Exit 8A (Rte. 7), alternating shoulder closures on exit ramp for bridge inspections, Monday and Tuesday from 8:30 a.m. to 4:30 p.m.
Interstate-95:
Find out what's happening in Johnstonwith free, real-time updates from Patch.
I-195 WB, from Exit 1A (Point St.) to I-95 SB, right shoulder closed for bridge inspection, Tuesday from 6 p.m. to 8:30 p.m.
I-95 NB & SB, from Exit 16 (Rte. 10) to Exit 18 (Thurbers Ave.), alternating shoulder closures for bridge inspection, Friday from 8:30 a.m. to 4:30 p.m.
I-95 between Exits 27 (Downtown) and 28 (School St.) posted for use only by vehicles of less than 18 tons. Detours required for heavier vehicles.
I-95 NB & SB at Exit 8 (Rte. 2), lanes shifted to the left. Use caution entering and exiting
Route 6A Overnight:
(Hartford Ave.) EB & WB, from the I-295 interchange to Atwood Ave., right lane closed for curbing and sidewalk work, Sunday-Thursday from 8 p.m. to 6 a.m.
Route 6A:
(Hartford Ave.) EB & WB, from the I-295 interchange to Atwood Ave., right lane closed for curbing and sidewalk work, Monday-Friday from 7 a.m. to 3:30 p.m.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.